If you’re working in industrial automation, pneumatic systems are probably the quiet backbone of your operations—and FRL units (Filter, Regulator, Lubricator) are their unsung workhorses. I’ve been supplying FRL units for over a decade, and one of the most common questions I get from new installers and maintenance techs is how to mount them correctly on DIN rails. Skimping on this step leads to leaky connections, inconsistent air pressure, and downtime that costs manufacturing teams hundreds, even thousands, of dollars an hour. This isn’t just a “plug-and-play” job; a proper mount ensures your FRL performs as intended, lasts longer, and keeps your line running smoothly. Let’s break down exactly how to do it right, with practical tips I’ve picked up from years of working alongside factory teams and troubleshooting mis-mounted units. FRL Units

First, let’s start with the basics: what is a DIN rail, and why does it matter for FRLs? DIN stands for Deutsches Institut für Normung, the German standards body that created the standardized rail design used across industrial control panels. DIN rails come in two main types: the thinner 35mm “top hat” rail (the most common for FRLs and small control components) and the 75mm wide rail, usually for heavier equipment. FRL units are designed to clip onto these rails, which lets you organize components neatly, save panel space, and simplify future maintenance—no more fumbling with loose pipes and messy wiring inside a tight enclosure. As a supplier, I always emphasize that mounting FRLs on DIN rails isn’t just for convenience; it’s a engineering choice that aligns with global industrial standards, so your system will work interchangeably with parts from any reputable manufacturer.
Before you even grab your FRL and rail, there are a few pre-mount checks you can’t skip. I’ve seen installers skip these, and they end up having to disassemble a perfectly good panel later, which is a waste of time and materials. First, confirm your FRL’s DIN compatibility. Not all FRL units come with a DIN mount adapter—some are panel-mounted only, while others have integrated clips that fit standard 35mm top hat rails. If your unit doesn’t have clips, you’ll need to order a compatible adapter (I stock these for all my standard FRL lines, so just reach out if you’re not sure what fits your model). Next, measure the space inside your panel. FRLs aren’t small, and they need clearance: at least 100mm of space above and below the unit for service (you’ll need to adjust gauges, drain bowls, or replace filters without prying adjacent components off the rail) and 50mm to the sides for airflow. I once had a customer who crammed three FRLs into a 300mm wide panel, leaving only 20mm on either side—they had to remove one unit within a month because they couldn’t replace the filter element. Always double-check the FRL’s footprint against your panel’s available rail length; if you need multiple units, leave enough gap between each to avoid pressure interference (I recommend 25mm between FRLs for standard 1/4-inch and 1/2-inch units).
Next, prepare the DIN rail itself. If you’re installing a new rail, cut it to length with a metal hacksaw or a rail cutter—never use a angle grinder, as the rough edges can damage the FRL’s mount clips or create sharp burrs that cut your hands. Once cut, deburr the ends with a file to smooth any sharp edges; a burr on the rail end can catch on your FRL’s clip when you slide it on, leading to a loose fit and air leaks. If you’re mounting the rail inside a panel, secure it first with rail mounting brackets at both ends and every 300mm in between for rails longer than 1 meter. Loose rails are a hazard—if the rail shifts, your FRL can come loose during operation, leading to sudden pressure drops or even falling out (I’ve had a FRL crack on a factory floor because it wasn’t secured to the rail, so don’t cut corners here). Also, make sure the rail is aligned horizontally, not tilted; a tilted rail makes the FRL’s drain bowl sit at an angle, which can cause water to accumulate in the wrong spot and damage the regulator.
Now, the actual mounting step. This is where a lot of new installers get it wrong: sliding the FRL onto the rail and calling it done. A proper DIN mount has two parts: a top clip that snaps onto the rail’s top edge and a bottom latch that locks into the rail’s bottom groove, to keep the unit from sliding off or vibrating loose during operation. Start with the bottom latch: hold the FRL at a 45-degree angle to the rail, aligning the bottom of the FRL’s mount with the lower groove of the DIN rail. Push the bottom of the FRL firmly until it clicks into place—you should hear a distinct snap to confirm it’s seated. Next, tilt the top of the FRL up against the rail until the top clip snaps over the rail’s top edge. Give the unit a firm tug forward and backward to test if it’s secure; if it moves more than a millimeter, the latch isn’t fully engaged. I always tell installers to “wiggle it hard” because factory vibration can loosen a half-engaged latch over time, and that’s a leak you don’t want to deal with mid-shift. If your FRL has a pressure gauge, double-check that it’s facing outward toward the panel door or your work area—you don’t want to have to open the panel every time you need to check air pressure.
Once the FRL is mounted, don’t hook up the air line yet—there’s one critical safety step: grounding. Pneumatic systems generate static electricity, especially when dry air flows through hoses, and that static can damage sensitive electronics or create a spark hazard in environments with flammable materials. DIN rail-mounted FRLs often have a grounding tab on the back of the unit; connect this to the panel’s ground bus with a 14-gauge copper wire (standard for industrial panels) to ensure the unit is properly grounded. I’ve seen customers skip this step in food processing plants, where fine dust is present, and end up with static buildup that interfered with nearby sensor systems. It’s a small step but one that meets OSHA and industrial safety standards, so it’s non-negotiable.
Now, for the connections—this is where a mis-mounted FRL can cause leaks, so take your time. Your FRL should be mounted in the correct order of your pneumatic system: air comes into the filter first, then the regulator, then the lubricator. If you mount them in the wrong order, the lubricator can push oil into the filter, clogging it, or the regulator can get damaged by dirty air before it’s filtered. Once the FRL is in the right order, use the correct fittings for your air line size: for 1/4-inch FRLs, use 1/4-inch NPT or BSPP fittings, not adapters that can create a gap between the FRL’s port and the hose. When tightening fittings, use a wrench on the FRL’s port, not the body of the FRL itself—tightening the body can crack the plastic or metal housing, leading to leaks. I always recommend using thread sealant (Teflon tape) for threaded connections, but don’t overdo it; wrap the tape around the threads in the direction you’re tightening, and leave the first thread bare so excess sealant doesn’t get pushed into the air line and clog the filter.
After you’ve mounted and connected the FRL, test it before putting it into full service. Turn on the air supply slowly, not suddenly—sudden pressure spikes can damage the regulator’s diaphragm. Listen for hissing sounds, which are a sign of leaks at the fittings or mount. If the FRL moves when you tap it with your finger, the latch isn’t secure, and you’ll need to re-mount it. Test the drain valve: open the manual drain to make sure water and condensate flow out freely, and check that the regulator is holding the set pressure. I always advise customers to do a 24-hour test run first; small leaks that aren’t obvious at first can turn into big problems over time, especially in high-cycle operations.
Now, what if you need to remove or reposition the FRL? This is another common task, and there’s a right way and a wrong way to do it. To unmount, locate the release tab on the bottom of the FRL (it’s usually a small plastic lever on the side of the mount). Press the tab firmly with a flathead screwdriver while pulling the bottom of the FRL away from the rail, then lift the top off the rail. Never pry the FRL off with a screwdriver on the side of the unit—this can damage the mount or the rail, leading to loose connections for the next unit you install. If you’re reusing the rail, inspect it for burrs or damage before mounting a new FRL; a bent rail can cause alignment issues and leaks.
As a supplier, I’ve worked with installers who have all kinds of setups: small machine shops, large automotive plants, food processing facilities, and packaging lines. One of the most common mistakes I see is using a universal adapter that doesn’t fit the DIN rail properly. Cheap adapters might look right, but they’re often too loose, leading to vibration that loosens fittings and causes leaks. That’s why I only sell FRL units with OEM-matched DIN mounts, and I always test them before shipping to make sure they lock securely into place. I also carry spare mount clips in case you lose or damage one—they’re a small part, but they’re essential for a secure fit.
Another tip I pass along to my customers: leave extra DIN rail space for future expansion. Industrial pneumatic systems often grow, and if you don’t plan ahead, you’ll have to rework your entire panel to add a new FRL. A good rule of thumb is to leave at least 100mm of empty rail next to your main FRL bank, so you can add a new filter or regulator without removing existing components.

If you’re still unsure about mounting your FRL correctly, or you need help choosing the right FRL for your system, I’m here to assist. We stock a full range of DIN-mountable FRL units for all pneumatic applications, from 1/8-inch mini units for small tools to 1-inch heavy-duty units for industrial production lines. We also offer custom adapter kits if you have a non-standard rail size or an older panel that needs retrofitting. Just reach out to our team to discuss your requirements, and we’ll help you get the right parts and guidance to mount your FRLs securely and efficiently.
Air Lubricators References
Industrial Automation and Control Systems Standards, International Electrotechnical Commission (IEC 60947-5-1)
Pneumatic System Installation Best Practices, Occupational Safety and Health Administration (OSHA)
DIN Rail Component Mounting Guidelines, National Electrical Manufacturers Association (NEMA)
Hangzhou Evershine Pneumatic Import & Export Co., Ltd.
Hangzhou Evershine Pneumatic Import & Export Co., Ltd. is one of the most professional frl units manufacturers and suppliers in China, featured by high quality pneumatic components. Please rest assured to wholesale bulk durable frl units from our factory. Welcome to contact us for custom service and OEM service.
Address: Hengkun Smart Industrial Park, No.176, Golf Road, Yinhu Street, Fuyang District, Hangzhou City, Zhejiang Province, China 311400
E-mail: Felix@waalpc.com
WebSite: https://www.evspneu.com/